Offshore works - Azerbaijan

Shah Deniz project

The Client was ВР Company.

In civil engineering works on the Shah Deniz site, the company completed the modernization of the Zikh-3 and Zikh-4 sites.

Within the framework of the project, EVRASCON Corporation built a large quay wall with immersion of metal piles-pipes with a diameter of 1720 mm and a length of 29 m into the base of the moorings and a metal tongue using a unique vibrating machine for immersion.

Specification of works:

  • Driving of metal tubular piles with a diameter of up to 1.72 m, a length of 15 m;
  • Construction of a new quay wall;
  • Construction of reinforced concrete foundations “Strongpoint” for the legs of the platforms.