Back to projects
Construction of roads - Azerbaijan

"Böyükşor-Pirşağı" Highway

The length of the new Beyukshor-Pirshagi highway is 12.7 kilometers. The new road begins in the Balakhany settlement area (near Lake Beyukshor), passes through the settlements of Digah and Mammadli, and continues to the settlements of Kurdakhany and Pirshagi.

This road, which will play a significant role in regulating traffic flows in the capital, is built to meet the most modern standards. It is classified as technical level 1b and consists of six lanes.

Along the road, six overpasses and one vehicle passage have been constructed. Additionally, three U-turns have been created.

To ensure comfortable and safe travel for both vehicles and pedestrians, new sidewalks have been built, and bicycle lanes have been laid in both directions. A modern lighting system has also been installed along the road.

Additional landscaping has been carried out on the median strips and shoulders. Furthermore, in line with modern requirements, electric charging stations for electric vehicles have been installed at the 3rd kilometer of the road.

Technical Data

• Total length of the road: 12.7 km
• Width of the roadbed: 30.6 m
• Width of each traffic lane: 3.5 m
• The highway consists of: 6 traffic lanes
• 3 interchanges
• 4 bridges
• 1 vehicle passage
• Construction start date: November 5, 2023
• Construction completion date: November 7, 2024

Telegram
WhatsApp