Irrigation works - Azerbaijan
Construction of a dam and a canal in Sheki-Oguz
I. Parameters for Sheki territory:
Total irrigated plot of land:
- Gross area - 10000 ha;
- Main pumping station over Turyanchay River: 109.6 m³/second - 1 pcs;
- Off-channel canals: 700 000 m³ - 1 pcs.
Dam:
- Maximum height - 31 m;
- Length - 200 m;
- Width - 6 m;
- Drilling and land operations of the dam - 38 283 m³;
- Casting and land operations - 223 484 m³;
- Concrete and reinforced concrete operations - 2340 m³.
Construction-operational hydraulic permeability unit:
- Total length of the unit - 293 m;
- Irrigation water consumption - 2.5 m³/second;
- Concrete and reinforced concrete operations - 3450 m³.
Accidental sprinkler:
- Total length of the sprinkler - 257 m;
- Main estimation of the sprinkler (3 % guaranteed consumption) - 8,37 m³/second;
- Concrete and reinforced concrete operations - 1290 m³.
In addition:
- 4-unit irrigation pumping station;
- Total length of pressure piping (MBBK);
- Pm 7240 consisting of steel pipes;
- Total length of pressured piping (PP) and distribution piping (PP-1; PP-2, PP-2-1) consisting of polyethylene and steel pipes pm 25150;
- Accidental sprinkler channel pm 7740;
- Indoor collectors and units for removing surface waters from the project site. Consisting of recast reinforced concrete pipes pm 17600.
Operational gravel road No.1 of Sheki – Oguz Aquapark pm 7650.
Operational gravel road No.2 of Sheki – Oguz Aquapark pm 1190.
Construction and operational road from Soyudlu village to Turyanchay pm 1250.
Underground hydraulic permeability units pcs 22.
II. For Oguz territory
Total irrigated plot of land:
- Gross area - 2300 ha;
- Small-sized water intake unit over Aghchay. Main unit;
- Pressurized water pool, water capacity V = 2500 m³ - pcs 1;
- Total length of pressure piping pm 10200;
- Cleaning «T» steel pipe over the water pool Dx = 530 x 7 mm pm 160.