I. Parameters for Sheki territory:

Total irrigated plot of land:

  • Gross area - 10000 ha;
  • Main pumping station over Turyanchay River: 109.6 m³/second - 1 pcs;
  • Off-channel canals: 700 000 m³ - 1 pcs.

Dam:

  • Maximum height - 31 m;
  • Length - 200 m;
  • Width - 6 m;
  • Drilling and land operations of the dam - 38 283 m³;
  • Casting and land operations - 223 484 m³;
  • Concrete and reinforced concrete operations - 2340 m³.

Construction-operational hydraulic permeability unit:

  • Total length of the unit - 293 m;
  • Irrigation water consumption - 2.5 m³/second;
  • Concrete and reinforced concrete operations - 3450 m³.

Accidental sprinkler:

  • Total length of the sprinkler - 257 m;
  • Main estimation of the sprinkler (3 % guaranteed consumption) - 8,37 m³/second;
  • Concrete and reinforced concrete operations - 1290 m³.

In addition:

  • 4-unit irrigation pumping station;
  • Total length of pressure piping (MBBK);
  • Pm 7240 consisting of steel pipes;
  • Total length of pressured piping (PP) and distribution piping (PP-1; PP-2, PP-2-1) consisting of polyethylene and steel pipes pm 25150;
  • Accidental sprinkler channel pm 7740;
  • Indoor collectors and units for removing surface waters from the project site. Consisting of recast reinforced concrete pipes pm 17600.

Operational gravel road No.1 of Sheki – Oguz Aquapark pm 7650.

Operational gravel road No.2 of Sheki – Oguz Aquapark pm 1190.

Construction and operational road from Soyudlu village to Turyanchay pm 1250.

Underground hydraulic permeability units pcs 22.

II. For Oguz territory

Total irrigated plot of land:

  • Gross area - 2300 ha;
  • Small-sized water intake unit over Aghchay. Main unit;
  • Pressurized water pool, water capacity V = 2500 m³ - pcs 1;
  • Total length of pressure piping pm 10200;
  • Cleaning «T» steel pipe over the water pool Dx = 530 x 7 mm pm 160.